20 Years of Innovation

Otis continues to build on the technology of its bestselling Gen2 elevator.

Image above - Rendering of a five-belt Gen2 machine with the belt guard removed to show the sheave

This article was originally published in the December 2020 edition of Elevator World magazine

When Otis introduced the machine-room-less (MRL) Gen2® elevator in early 2000, it featured something entirely new: belts in place of steel cables — an innovation that allowed Otis engineers to create an efficient, compact machine that would fit easily inside the hoistway. The Gen2 elevator became an immediate success, with customers embracing its energy efficiency; space-saving design; and smooth, quiet ride.

"Otis has continued to evolve the Gen2 system to meet the needs of customers and passengers in an increasingly digital world."

Since, Otis has continued to evolve the Gen2 system, incorporating new features to meet the changing needs of customers and passengers in an increasingly digital world. This continuous innovation has helped fuel sales, which surpassed 1 million units in 2020, making the Gen2 the bestselling elevator in Otis’ 167-year history. Now, as the company celebrates the 20th anniversary of the Gen2 launch, it’s a good time to revisit the story behind its development: a drama-filled epic and the elevator industry’s version of the space race of the 1960s.

The idea of eliminating the machine room emerged in the 1990s during a time of intense competition and rapid innovation in the elevator industry. Until that time, elevator installations required a room to house the machine that drives the elevator, along with the controller, drive and other equipment. Eliminating that room would give architects greater design freedom, reduce “roof pollution,” cut construction costs and increase rentable space for building owners. The first MRL elevator was introduced in 1996, and it was against this backdrop that a team of Otis engineers from around the world convened in Connecticut to brainstorm concepts for a new elevator. From this gathering, the idea of using flexible, steel-reinforced polyurethane belts emerged.

Unwinding the Cable

Because steel ropes are relatively rigid, they require a large sheave to increase the bending radius and reduce stress on the cables. Modern safety codes dictate a 40:1 ratio between the diameter of the drive sheave to the diameter of the cable. In other words, sheaves must have a diameter at least 40 times the diameter of the suspension cable. Thus, a typical 1/2-in. cable requires a 20-in. -diameter sheave. Flat belts presented a way to radically reduce the size of the sheave, while meeting the 40:1 code requirement: engineers would keep the cable, but unwind the individual strands, lay them side by side and encase them in polyurethane — an organic polymer known for its flexibility, strength, durability and heat resistance. The belts Otis created were thinner than 3 mm (1/8 in.). (Cables are still used for high-rise and super-high-rise applications.)

The flexible belt allows for a significantly smaller bending radius. The polyurethane coat reduces wear and operational noise.

The thin belts gave Otis the freedom to dramatically reduce the size of the machine sheave, to less than 5 in. in diameter – about 85% smaller than the sheave of the machine it replaced. The smaller sheave, in turn, meant much less torque was required to drive the machine. The Gen2 machine is compact enough to fit on a crossbeam at the top of the hoistway, eliminating the need for a separate machine room. Without a machine room, the controller and drive can go anywhere, as long as they are within a certain distance of the machine.

A custom Gen2 glass elevator installed by Otis in 2019 carries Empire State Building visitors to the reimagined 102nd-floor observatory, now enclosed in glass to provide unobstructed, 360° views of NYC and beyond.

The Gen2 sheave is less than 5 in. in diameter, about 85% smaller than the sheave on the machine it replaced.

Ride Quality

The Gen2 elevator delivers a smooth, quiet ride. First, the steel-reinforced polyurethane belts did away with a source of noise sometimes referred to as “rope sing”: the whir or hiss created by the metal-to-metal contact of steel ropes moving over the metal sheave. Otis also redesigned the car itself to improve ride quality, even as its overall weight was reduced. This cut both energy consumption and operating costs. Engineers designed a sturdier car frame to minimize vibration and a new ventilation system to bring fresh air into the cab while muffling noise. Noise and vibration were further reduced when the sliders that keep the elevator car on the rails were replaced with high-quality, low-friction roller guides. Special isolation pads under the machine muffle the sound it produces, and with the relays mostly eliminated, even the controller is quiet.

Sustainability

The Gen2 elevator also represented a commitment to green technology. Its highly efficient permanent-magnet synchronous motor reduced energy consumption by 50% compared to the induction machine system it replaced. An even greater improvement in the Gen2’s overall energy efficiency was realized later with the addition of the ReGen® regenerative drive technology, which had previously been available only on high-rise systems. When these systems are combined with other energy-efficient features, such as LED lighting, overall energy consumption can be reduced by 75% under normal operation, compared to that of conventional geared machines with non-regenerative drives. ReGen drives today are standard on all Otis Gen2 and SkyRise® elevator systems.

“The Gen2 elevator also represented our commitment to green technology.”

The Gen2 elevator also features permanently sealed bearings, eliminating a source of hazardous waste. No additional lubrication is needed, nor do the belts themselves require lubrication.

Mechanical to Digital

The latest models of the Gen2 elevator are based on the original Gen2, sharing the same flat-belt technology and efficient machine, but are smarter and more connected. Today’s Gen2 elevators generate massive amounts of data with every trip, and this data improves support for customers and passengers. For example, the Otis ONE® digital service platform uses big data analytics and proprietary algorithms to help predict and prevent shutdowns. Similar intelligence and connectivity powers the eCall® smartphone app, touchless technology that reduces wait time by allowing passengers to summon their elevator from anywhere in the building so it is there waiting for them when they arrive. In addition, the eView® streaming service delivers news and entertainment directly to an in-car display for passengers to enjoy during the ride. It also allows building managers to deliver important information to tenants.

The Gen2 elevator was introduced in Europe in 2000, and the first units were installed in Linz, Austria. Twenty years later, Gen2 elevators can be found in nearly every one of the 200 countries and territories where Otis does business.

Configurations can be tailored to specific needs of a given location, whether it’s for a residential or commercial building, mixed-use tower, retail setting, hotel, hospital, metro system or airport. Initially designed for low- and mid-rise buildings, the Gen2 elevator is now available in some areas of the world for high-rise buildings up to 150 m. There is even a model that operates on battery power. Aesthetic options allow customers to design stylish cab interiors that complement the character of their buildings.

“Configurations can be tailored to specific needs, whether it’s a residential or commercial building, mixed-use tower, retail setting, hospitality, hospital, metro system or airport.”

Gen2 elevators have been installed in some of the world’s most iconic supertall and megatall buildings. At the Empire State Building, for example, a custom-made glass Gen2 elevator carries visitors from the 86th floor to the refurbished 102ndfloor observatory. At Seoul’s Lotte World Tower, certain Gen2 elevators are designated “lifeboats,” programmed to travel in an emergency between safe evacuation zones and the ground floor. Dubai’s Burj Khalifa (currently the world’s tallest building), Shenzhen’s Ping An Finance Center, Tour Carpe Diem in Paris and London’s 22 Bishopsgate also feature Gen2 elevators.

As COVID-19 turned into a global crisis, Otis worked to meet new requirements and needs. Touchless solutions, purifying systems, remote monitoring and the novel deployment of dispatching technologies to support social distancing all show the Gen2 system’s adaptability in the face of the pandemic. Looking to the future, Otis engineers continue to reimagine the Gen2 elevator. The company is preparing to introduce a new elevator platform based on the Internet of Things but built around 20 years of innovations and refinements that have focused on improved reliability and passenger comfort.

  • Topics:
  • Innovation and Technology, Newsroom
  • Otis News

    Check out our latest news releases
    newsCoverImage
    • October 29, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.44 per Share READ THE ARTICLE
    newsCoverImage
    • October 28, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Third Quarter 2026 Results READ THE ARTICLE
    newsCoverImage
    • October 7, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Third Quarter 2026 Earnings Advisory READ THE ARTICLE
    newsCoverImage
    • September 30, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Named Among World's Best Employers READ THE ARTICLE
    newsCoverImage
    • September 15, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Implements Long-Standing CEO Succession Plan READ THE ARTICLE
    newsCoverImage
    • September 9, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Included Among World’s Best Companies by TIME READ THE ARTICLE
    newsCoverImage
    • September 1, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis CEO to Speak at Morgan Stanley Conference READ THE ARTICLE
    newsCoverImage
    • April 23, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Receives Climate Leadership Recognition READ THE ARTICLE
    newsCoverImage
    • April 22, 2026
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports First Quarter 2026 Results READ THE ARTICLE
    Otis hardhat next to "Otis declares quarterly dividend" message
    • January 30, 2025
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.39 per Share READ THE ARTICLE
    Text on left over a navy and gold background, city at night on the right
    • January 29, 2025
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Full Year and Fourth Quarter 2024 Results READ THE ARTICLE
    Otis logo
    • January 16, 2025
    • FARMINGTON, CONNNECTICUT, UNITED STATES
    Otis Authorizes $2 Billion for Share Repurchase READ THE ARTICLE
    Earnings Advisory
    • January 8, 2025
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Fourth Quarter 2024 Earnings Advisory READ THE ARTICLE
    Red dot smart
    • August 6, 2024
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Wins 3 Red Dot Design Awards READ THE ARTICLE
    Q2 2024 dividend announcement graphic with Otis hard hat
    • July 25, 2024
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.39 per Share READ THE ARTICLE
    Otis declared quarterly dividend
    • February 1, 2024
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.34 per Share READ THE ARTICLE
    Q4 and full year earning release
    • January 31, 2024
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Full Year and Fourth Quarter 2023 Results READ THE ARTICLE
    otis in sandstone on navy background
    • November 29, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis to Host 2024 Investor Day READ THE ARTICLE
    Otis declares quarterly dividend on blue background
    • October 26, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.34 per Share READ THE ARTICLE
    Earnings_Results
    • October 25, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Third Quarter 2023 Results READ THE ARTICLE
    A group of students
    • September 5, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Students Set to Develop Ideas for Improved Access to Green Space READ THE ARTICLE
    Otis logo on blue background
    • September 1, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis CEO to Speak at Morgan Stanley Conference READ THE ARTICLE
    Otis employee Franck on mobile phone inside an elevator
    • August 29, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    How Gen360 Sets New Standards for Safety READ THE ARTICLE
    Otis volunteers at the opening ceremony of the Special Olympics World Games
    • July 28, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Continues Longstanding Special Olympics Support READ THE ARTICLE
    Otis declares quarterly dividend on blue background
    • July 27, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.34 per Share READ THE ARTICLE
    "Q2 2023 Earnings Results" on a blue background
    • July 26, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Second Quarter 2023 Results READ THE ARTICLE
    Q1 2023 Earnings in tan on navy background
    • April 26, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports First Quarter 2023 Results READ THE ARTICLE
    Little girl on top of Father's shoulders looking at a skyline
    • April 6, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Publishes 2022 ESG Report READ THE ARTICLE
    Otis employees helping at a food bank
    • April 5, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Making Every Hour Count READ THE ARTICLE
    Otis earnings Q4 2022 sand on blue background
    • February 1, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Full Year and Fourth Quarter 2022 Results READ THE ARTICLE
    Otis logo on navy background says earnings advisory February 1, 2023 8:30am EST
    • January 11, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Fourth Quarter 2022 Earnings Advisory READ THE ARTICLE
    Q4 Full year Earnings results
    • January 10, 2023
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Fourth Quarter 2023 Earnings Advisory READ THE ARTICLE
    Florence South Carolina Otis Elevator Factory
    • December 21, 2022
    • FLORENCE, SOUTH CAROLINA, UNITED STATES
    Otis Florence Factory Receives Zero Waste to Landfill Certification READ THE ARTICLE
    Otis declared quarterly dividend - on navy background
    • October 27, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.29 per Share READ THE ARTICLE
    Q3 2022 Earnings Results on blue background
    • October 26, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Third Quarter 2022 Results READ THE ARTICLE
    Nelda Connors appointed to Otis board
    • October 24, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Nelda Connors Appointed to Otis Worldwide Board of Directors READ THE ARTICLE
    Q2 2022 Quarterly Dividend
    • July 28, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.29 per Share READ THE ARTICLE
    Otis logo on navy background
    • July 27, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Sells Its Russia Business READ THE ARTICLE
    Otis reports Q1 2022 results
    • April 25, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports First Quarter 2022 Results READ THE ARTICLE
    Otis Volunteers
    • April 18, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Helping Communities Connect and Thrive Through Volunteerism READ THE ARTICLE
    Otis presents value creation 2022 Investor Day
    • February 15, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Presents Value Creation Strategy at 2022 Investor Day READ THE ARTICLE
    Otis announces quarterly dividend on February 3, text on blue background
    • February 3, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.24 per Share READ THE ARTICLE
    Two Otis elevator mechanics working
    • February 2, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Fortune Names Otis to “Most Admired Companies” List READ THE ARTICLE
    Otis logo blue background Q4 Earnings on Jan 31 2022
    • January 14, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Fourth Quarter 2021 Earnings Advisory READ THE ARTICLE
    Investor Day Advisory
    • January 12, 2022
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis 2022 Investor Day to be Hosted Virtually READ THE ARTICLE
    Florence ESG
    • October 28, 2021
    • FLORENCE, SOUTH CAROLINA
    Otis Achieves ESG Goal READ THE ARTICLE
    Otis logo quarterly dividend
    • October 28, 2021
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Declares Quarterly Dividend of $0.24 per Share READ THE ARTICLE
    Otis Q3 2021 results
    • October 25, 2021
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Reports Third Quarter 2021 Results READ THE ARTICLE
    Florence Zero Waste to Landfill sort
    • September 20, 2021
    • FLORENCE, SOUTH CAROLINA
    Otis’ First Zero Waste to Landfill Pilot Begins READ THE ARTICLE
    Judy Marks to speak at Morgan Stanley
    • August 30, 2021
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis CEO to speak at Morgan Stanley Virtual Conference READ THE ARTICLE
    Otis Reports Second Quarter 2021 Results
    • July 26, 2021
    • FARMINGTON, CONNECTICUT, USA
    Otis Reports Second Quarter 2021 Results READ THE ARTICLE
    Otis ESG goals header
    • May 26, 2021
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Announces Global ESG Goals READ THE ARTICLE
    Otis Declares Quarterly Dividend of $0.20 per Share
    • February 4, 2021
    • FARMINGTON, CONNECTICUT, USA
    Otis Declares Quarterly Dividend of $0.20 per Share READ THE ARTICLE
    Otis Logo and fourth quarter earnings
    • February 1, 2021
    • FARMINGTON, CONNECTICUT, UNITED STATES
    Otis Full Year and Fourth Quarter 2020 Results READ THE ARTICLE
    Stage-3-Results_news_room
    • July 28, 2020
    • FARMINGTON, UNITED STATES
    Otis Second Quarter 2020 Results READ THE ARTICLE
    Otis continues to build on the technology of its bestselling Gen2 elevator.
    11/19/20 9:00 PM
    11/19/20 9:00 PM