Two buildings for Gen3 MOD elevators

Gen3™ MOD

The upgrade you and your passengers will feel

Why modernise your rope lift with Otis

Upgrading your rope lift system to the Gen3™ MOD belt solution is the smart choice to elevate your building’s appeal and value. Packed with Otis signature technologies and delivered with minimal disruption by our expert teams, it opens the door to safer, smoother, smarter rides, improved uptime and greater durability.

Explore the benefits of the Gen3 MOD solution

lock icon

ENHANCE SAFETY

At Otis, safety is always first.

Learn more

plug icon

IMPROVE PERFORMANCE & RELIABILITY

Gain access to cutting-edge and connected solutions.

Learn more

 

Minimize icon

MINIMISE THE UNEXPECTED

Discover our proven experience.

Learn more

Leaf icon

BOOST SUSTAINABILITY

 

Packages tailored to your buildings’ needs.

Learn more

People Icon

BRING PASSENGER EXPERIENCE TO THE NEXT LEVEL

Contemporary aesthetics and advanced technologies.

Learn more

Customer service representative

 ENHANCE SAFETY

 

• Reduce tripping hazards while entering and exiting the lift with +/- 5mm stopping accuracy. ​

 Provide constant monitoring of the system in real time via the Otis ONE™* digital platform.

 Detect passengers and prevent doors from closing via door detectors with an infrared safety zone.

*Otis ONE features subject to a maintenance contract and paid tiered subscription with Otis.

Belt Gen360 Mod

 IMPROVE PERFORMANCE & RELIABILITY

 

• Help prevent outages and obsolescence with a new electronic control system and a gearless machine. 

• Receive real-time data insights and access remote services (where available). 

• Experience state-of-the-art polyurethane coated steel belts, which are three times longer-lasting and 20% lighter than conventional ropes.

smiling Otis mechanic

MINIMISE THE UNEXPECTED

 

 Plan your budget with our experts from the earliest stages of capital planning to ongoing operations.

ReGen

BOOST SUSTAINABILITY

 

Reduce energy consumption with our ReGen™ drive, which recaptures energy generated by the lift and returns it to the building’s grid.

• Remove the need for oil with our coated steel belt design.

• Options include commonly available efficiency features like LED lighting and sleep mode that help reduce energy consumption.

Dispatch system

BRING PASSENGER EXPERIENCE TO THE NEXT LEVEL

 

• Delight passengers with various aesthetics and accessibility features.

• Provide easy travel & shorter wait times thanks to our intelligent dispatch system.

• Reduce vibration (up to 12%) and noise in the car (up to 52%) compared to conventional geared systems.

Person looking at smart phone while waiting for a Gen3 MOD elevator

Explore our Gen3 MOD solution

Download the brochure

Explore the packages of the
Gen3 MOD solution

Our packages let you decide how to upgrade your building.

HydroFit Plus logo

This package provides a replacement of the lift’s key components and includes: a connected control system, a gearless machine, suspension belts and our ReGen drive.

Learn more

Gen3 full replacement icon

With the Gen3™ Full Replacement Package, you install a brand‑new Gen3 lift, selected from our broad range of modern, high‑performance solutions, directly into your existing hoistway.

Learn more

Gen3 MOD Plus package

Standard upgrades

1. Controller with Otis ONE* and ReGen Drive​

2. In-car control panel​ with eView™ in-car display

3. Landing fixtures and hall signage​

4. Gearless machine & Pulse™ electronic system​

5. Belts with car and counterweight interfaces


Key options

6. Car door operator

7. Car interior

8. Overspeed governor

*Otis ONE features are subject to a maintenance contract and paid tiered subscription with Otis.

Gen3™ Full Replacement Package

Discover our Gen3 New Equipment range and benefit from the installation of a new lift in your existing hoistway that complies with the latest standards.

Let's modernise your lift system together

Curious about the cost of a lift modernisation? Are you ready to discuss a modernisation proposal? 
Contact us today for a personalised quote to start your modernisation journey.

Discover the projects of those who have already chosen Otis for lift modernisation

burj khalifa

March 6, 2024 |
FARMINGTON, CONNECTICUT, UNITED STATES

Otis Wins Modernization Project and 10-Year Service Contract Extension for Burj Khalifa

 

READ ABOUT BURJ KHALIFA

birmann

January 11, 2024 |
SÃO BERNARDO DO CAMPO, BRAZIL

Otis Brazil Completes
Elevator Modernization at
Birmann 21

 

 

READ ABOUT BIRMANN